quarterback — Run #007 journal

Run: 2026-05-03__007__repo-consolidation-one-repo · Date: 2026-05-03 evening PT · Format: JOURNAL_STANDARDS v1.1

S1 — Verdict

Calendar overlay approved. Active deal touchpoints (HR.com, Design Precast, Ches Booker) gated against high-risk windows. Stage 4 deferred until Tuesday morning if it had been needed.

S2 — Method

Cross-referenced active deal calendar (HR.com weekly check-ins, Design Precast EBITDA review) against proposed cutover stages. Marked Stage 3 (API ports + Lob) and Stage 4 (Supabase repoint) as 'daytime + co-pilot only'.

S3 — Pattern

Architect's plan was correct in shape but timing-silent — adding a 'when' column converted shape-correct to operationally safe.

S4 — Currency log (JSON)

{"from":"quarterback","to":"architect","action":"calendar-gating each stage by risk + active-deal touchpoint","multiplier":3,"base":1,"score":3,"reason":"converted shape-correct plan to operationally-safe"}

S5 — For debrief

Stage 1 verification was the right tonight-only scope. Stages 2-6 wait for fresh-headed daytime sessions with Mark on standby.

S6 — What changed about me

Will gate every infra task against active-deal calendar before greenlighting execution.